Asia Baru Construction
 
We are in civil and building construction with particular specialisation in Water Works and Sewerage project ranging from sewerage treatment plant, river intakes, water treatment plants, storage tanks, reservoirs, pipe laying and major diversion...etc
 
 
 
 
PROJECTS > PEMBINAAN LOJI RAWATAN KUMBAHAN SERANTAU BANDARAYA MELAKA DI TAMBAK LAUT, MELAKA

Project Background
A Sewerage Treatment Plant (STP) with an ultimate capacity of 360,000 PE with Phase 1 constructed for 120,000 PE.

The plant is designed with SBR process to treat sewage to category 1 standard ‘A’ effluent as per Malaysian Sewerage Industry Guidelines (MSIG). Additional modules of the mechanized STP will be implemented in a later stage in tandem with the increase of sewage flow. Treated effluent is discharged to a receiving main drain located approximately 500m from the plant. Waste sludge is thickened and dewatered within the STP facility.

The Project comprises of the following components :-

(a) Inlet Work
(b) Secondary Screen Chamber
(c) Grit and Grease Chamber
(d) Flow Distribution Chamber
(e) Balancing Tank
(f) SBR Tanks
(g) Disinfection Tank
(h) Reclaimed Water Building
(i) Sludge Holding Tank
(j) Mechanical Sludge Thickener Facility
Project Information
Client / Owner: Jabatan Perkhidmatan Pembetungan Kementerian Tenaga, Teknologi Hijau Dan Air
Consultant: DNP Consult Sdn Bhd
Main Contractor: Asia Baru Construction Sdn Bhd
Sub-Contractor:
Date of Commencement: 23rd August 2013
Date of Completion: 16th May 2017
Project Methodology