We are in civil and building construction with particular specialisation in Water Works and Sewerage project ranging from sewerage treatment plant, river intakes, water treatment plants, storage tanks, reservoirs, pipe laying and major diversion...etc
 
 
 
 
PROJECTS > Cadangan Pembinaan Loji Rawatan Air (LRA) Kahang Yang Baru Dan Sistem Agihan Air Daripada LRA Kahang

Project Background
A design and build project implemented by the State Government of Johor to provide additional treated water supply to Kluang District from the new Kahang Dam to ensure supply adequacy during the dry seasons and to meet future demand as well as to phase out old WTPs with unreliable raw water sources.

The project scope includes:

1. Construction of a raw water Booster Pump Station of 90MLd capacity at Kahang Dam.

2.Laying of 2.8km length of 1200mm dia. and 15km of 1000mm dia. MSCL pipelines.

3. Construction of a water treatment plant of 90 MLd capacity with M&E works for an initial phase of 45 MLd capacity.

4. Construction of two balancing reservoirs (Sembrong Timur 3) of 6.5ML capacity.

5. Upon completion of raw water Booster Pump Station, provide O&M to supply raw water to an existing WTP then upon completion of WTP revert the raw water supply pipeline to a treated water pumping main for supply to the two balancing reservoirs.
Project Information
Client / Owner: Bahagian Perancang Ekonomi Negeri Johor (BPENJ)
Consultant: HLA Associates Sdn Bhd
Main Contractor: Konsortium PDT - Asia Baru
Sub-Contractor:
Date of Commencement: 28th November 2017
Date of Completion: 28th November 2020
Project Methodology