Construction & Completion of Wangsa Maju Booster Pumping System & Ancillary Works

Previous slide
Next slide

Project Information

Wangsa Maju, Wilayah Persekutuan

Client / Owner

Perbadanan Urus Air Selangor Berhad (PUAS)

Consultant

SMHB Sdn. Bhd.

Main Contractor

Lebar Daun Construction Sdn Bhd

Sub-Contractor

Asia Baru Construction Sdn Bhd

Date of Commencement

18th September 2003

Date of Completion

17th March 2004

The works under this project from part of the works under the scheme for effective utilisation of water supply from Sg. Selangor Phase 3 Bukit Badong source works and strategies for relieving the Sg. Semenyih and Sg. Langat supplies.

Prior to year 2004, demand areas in Pudu Ulu, Cheras Indah, Pandan, Shamelin Perkasa, Dato Keramat AU3 etc. received water supply from Sg. Langat source works. Treated water from Sg. Langat Treatment Plant was pumped to Langat Balancing Reservoir and subsequently gravitated to New Pudu Ulu Reservoir in Cheras area. This New Pudu Ulu Reservoir serves as the storage reservoir supplying the demand areas mentioned above.

Due to the increase in water demand exerted by new housing and commercial developments and commitment of Sg. Langat Treatment Plant to satisfy the consumers located upstream of these areas, a new alternative water supply source is therefore required as the Sg. Langat source works had been stretched to the limit.

Meanwhile, the Sg. Selangor Phase 3 Bukit Badong source works had been completed and surplus water was available for supply to other demand areas. However, the capacity of the existing trunk supply network could only convey the surplus water up to Wangsa Maju area. Therefore, new pumping facility was required to boost the pressure in the system for supplying the surplus water to New Pudu Ulu Reservoir, which is located more than 20 km away from Wangsa Maju. In order to achieve this objective, this project was implemented by Perbadanan Urus Air Selangor Berhad (PUAS), now SYABAS on fast-track basis through invited tender. The contract was awarded to Lebar Daun Construction Sdn Bhd, i.e. the tenderer who submitted the lowest bid. The whole Contract was in turn sub-contracted to Asia Baru Construction Sdn. Bhd.

Briefly, the scope of works for this Contract Package comprises the following major components:

  1. Construction of booster pump station including provision of temporary cofferdam.
  2. Construction of TNB sub-station, 11kV switchroom and transformer yard.
  3. Laying of 1200mm diameter incoming suction main from Dusun Kubong Reservoir and delivery main to New Pudu Ulu Reservoir complete with surge suppression system, electrically actuated control valves including inter-connection to the existing pipelines.
  4. Supply and installation of 5 Nos. 45 Mld capacity variable speed pumps and variable speed drive motors.
  5. Supply and installation of TNB metering panels, switchgears, transformers, control panels and power cabling.
  6. Supply and installation of 1200mm diameter electromagnetic flowmeters, instrumentation and control cabling including remote transmission to New Pudu Ulu Site and PUAS Head Office.
  7. All other associated M&E works including building services and external lighting.
  8. All other associated civil and structural works including retaining wall, drain, road, fencing etc.