O&M Services

Asia Baru Water Services Sdn Bhd, a 95% owned subsidiary of Asia Baru Construction Sdn Bhd, was incorporated in January 2016 to provide Operation and Maintenance (O&M) services of reservoir, dam, water treatment plant and raw water plant.

Projects undertaken by the Company include:-

Emergency Water Supply from Seluyut Dam to Lebam Dam – O&M Services for a 60 MLd capacity intake pump station using a duty & standby Genset for power supply – March 2016 to June 2016

  • Client: PRPC Water S/B (Petronas)
  • Period: March 2016 to June 2016

Procurement, Construction & Commissioning of Raw Water Supply Project to Rapid (PAMER) – O&M Services for the 260 MLd capacity pumping system to transfer water from Seluyut Dam to Lebam Dam – June 2016 to November 2016

  • Client: PRPC Water S/B (Petronas)
  • Period: June 2016 to November 2016

Pengoperasian dan Penyelenggaraan Loji Bekalan Air Mentah dari Sg. Layang ke Tg. Langsat bagi Bekalan Air kepada Bahru Stainless Sdn Bhd – O&M Services for an Intake Pump Station of 24 MLd capacity at Upper Layang Dam

  • Client: Johor Special Water (JSW)
  • Period: June 2017 – March 2021

Projek Kecemasan Penyaluran Air Mentah Daripada Sg. Lenggor Ke Empangan Congok, Mersing – Emergency O&M Services for an Intake Pump Station of 32 MLd capacity for the Sg. Lenggor – Congok Dam raw water transfer scheme.

  • Client: July 2017 – Unit Perancang Ekonomi Negeri (UPEN) Johor/ Badan Kawalselia Air Johor (BAKAJ)
  • Period: July 2017 – July 2018

Projek Pembekalan Air Mentah Layang 2 Fasa 2 daripada Empangan Seluyut ke Empangan Upper Layang – sharing a common facility with project PAMER (Petronas), to provide Emergency O&M Services for a 300 MLd capacity pumping system to transfer water from Seluyut Dam to Upper Layang Dam.

  • Client: Bahagian Perancang Ekonomi Negeri (BPEN) Johor
  • Period: April 2019 – October 2020

Cadangan Pembinaan Loji Rawatan Air (LRA) Kahang Yang Baru Dan Sistem Agihan Air Dari LRA Kahang ke Bandar Kluang, Johor – O&M Services for the 48 MLd capacity raw water booster pump station to supply raw water from Kahang Dam to Sembrong Timur Water Treatment Plant

  • Client: Bahagian Perancang Ekonomi Negeri (BPEN) Johor
  • Period: September 2018 – March 2021