Pembinaan Loji Rawatan Kumbahan Serantau Bandaraya Melaka

Previous slide
Next slide

Project Information

Tambak Laut, Melaka

Client / Owner

Jabatan Perkhidmatan Pembetungan Kementerian Tenaga, Teknologi Hijau Dan Air

Consultant

DNP Consult Sdn Bhd

Main Contractor

Asia Baru Construction Sdn Bhd

Date of Commencement

23rd August 2013

Date of Completion

16th May 2017

A Sewerage Treatment Plant (STP) with an ultimate capacity of 360,000 PE with Phase 1 constructed for 120,000 PE.

The plant is designed with SBR process to treat sewage to category 1 standard ‘A’ effluent as per Malaysian Sewerage Industry Guidelines (MSIG). Additional modules of the mechanized STP will be implemented in a later stage in tandem with the increase of sewage flow. Treated effluent is discharged to a receiving main drain located approximately 500m from the plant. Waste sludge is thickened and dewatered within the STP facility.

The Project comprises of the following components :-

  • Inlet Work
  • Secondary Screen Chamber
  • Grit and Grease Chamber
  • Flow Distribution Chamber
  • Balancing Tank
  • SBR Tanks
  • Disinfection Tank
  • Reclaimed Water Building
  • Sludge Holding Tank
  • Mechanical Sludge Thickener Facility