The works under this project form part of the overall works under the programme of replacement of existing asbestos cement pipes in Wilayah Kuala Lumpur for reduction of non-revenue water (NRW).
SYABAS had identified that the existing asbestos cement pipes in the following areas were in poor structural condition and frequently burst causing serious leakage and lost of treated water. Therefore, these pipelines require to be urgently replaced to reduce the NRW:
To implement the above project, SYABAS invited open tender from qualified Class ‘A’ Contractor registered with both PKK and CIDB. The Contract was awarded to Casavest (M) Sdn Bhd, i.e. the lowest qualified tenderer after evaluation. The physical pipelaying and associated works was in turn sub-contracted to Asia Baru Construction Sdn. Bhd.
Briefly, the scope of works for this Contract Package comprises the following major components: