Project Pembekalan Air Mentah Layang 2 Fasa 2 daripada Empangan Seluyut ke Empangan Upper Layang

Previous slide
Next slide

Project Information

Kota Tinggi, Johor

Client / Owner

Unit Perancang Ekonomi Negeri Johor (UPENJ)

Consultant

SMHB Sdn Bhd

Main Contractor

Konsortium PDT – Asia Baru (Design & Build)

Date of Commencement

12th February 2017

Date of Completion

11th February 2019

The Project is implemented by the State Government of Johor with the objective to have a second pipeline for transferring of raw water from Seluyut Dam to Upper Layang Dam.

The main components of the Project are as follows:-

  1. Procurement and construction of 33km of DN 1300 mm mild steel cement lined pipes.
  2. Construction of pipe jacking works across Senai-Desaru Expressway, Jalan Tiram and Jalan Kota Tinggi-Sg Rengit
  3. Construction of pipe crossing at Sg Johor, Sg Seluyut and Sg Tiram.
  4. Procurement, installation, testing and commissioning 3nos of 150Mld pumps at existing Seluyut Booster Pumping Station complete with surge suppression system and all associated mechanical and electrical works.