Projects

Projek SKIM Bekalan Air Batu Hampar

Previous slide
Next slide

Project Information

Rembau, Negeri Sembilan

Client / Owner

Jabatan Bekalan Air Negeri Sembilan (JBANS)

Consultant

Sepakat Setia Perunding Sdn Bhd

Main Contractor

Konsortium MBI-SCT

Sub-Contractor

Asia Baru Construction Sdn Bhd

Date of Commencement

28th November 2007

Date of Completion

27th November 2009

Pakej 2 – Construction and Completion of Barrage, Intake, Water Treatment Plant and Associated Works

Jabatan Bekalan Air Negeri Sembilan (JBANS), an agency of The State Government of Negeri Sembilan intends to construct a water treatment works next to Sg. Rembau near Kg. Sawah Raja, in the district of Rembau as part of the “Skim Bekalan Air Batu Hampar” to supply potable water to meet the demands of Port Dickson (South) and Rembau districts up to Year 2020.

JBANS awarded the Contract Pakej 2 – Construction and Completion of Barrage, Intake, Water Treatment Plant and Associated Works to Konsortium MBI-SCT, i.e. an unincorporated Consortium of a State Government owned company Menteri Besar Incorporated and a local construction company Setaracita Construction & Trading Sdn Bhd. Impressed by Asia Baru’s experiences and track records in water supply projects, the Konsortium MBI-SCT, sub-contracted the works to Asia Baru Construction Sdn Bhd.

Briefly, the scope of works for this Contract comprised the following major components:

  • Reinforced concrete barrage structure across Sg. Rembau.
  • Raw water intake pump station of ultimate capacity 100 Mld.
  • A 1000mm diameter raw water pumping main.
  • Water treatment works of ultimate capacity 100 Mld which comprises the following facilities:
  • Aerator
  • Inlet mixing cum backwash tank
  • Clarifiers
  • Filters and gallery
  • Clear water tank
  • Treated water pump station
  • Control building
  • Chemical building
  • Chlorine building
  • Generator building
  • Sludge treatment facility
  • A 800mm diameter treated water pumping main.
  • All mechanical and electrical works including pumping plants, treatment process system and
    equipment, instrumentation and control system.
Generally, the civil and structural works were designed to ultimate capacity of 100 Mld, except for clarifiers,filters and clear water tank which were constructed to Stage 1 capacity of 50 Mld. Whereas, most of the M&E equipment were only installed for Stage 1 capacity of 50 Mld.