Proposed Bertam DAF Phase 2 Water Treatment Plant

Previous slide
Next slide

Project Information

Durian Tunggal, Melaka

Client / Owner

Pengurusan Aset Air Berhad (PAAB)

Consultant

Angkasa Consulting Services Sdn Bhd

Main Contractor

Asia Baru Construction Sdn Bhd

Date of Commencement

28th March 2011

Date of Completion

17th May 2013

Package 1 – Construction and Completion of Intake Tower and Raw Water Pumping Station at Durian Tunggal Dam and 1200mm Diameter Raw Water Pipeline from Durian Tunggal Dam to Bertam DAF Phase 2 Water Treatment Plant

Pengurusan Aset Air Berhad (PAAB) called an open tender for Construction and Completion of Intake Tower and Raw Water Pumping Station at Durian Tunggal Dam and 1200mm Diameter Raw Water Pipeline from Durian Tunggal Dam to Bertam DAF Phase 2 Water Treatment Plant. Asia Baru Construction Sdn Bhd was successful in its bid and was awarded the Contract. The works under this Contract, when completed, will supply raw water to the Proposed Bertam DAF Phase 2 Water Treatment Plant.

Briefly, the scope of works under the Contract comprised the following major components:

  • Intake tower and siphon vacuum pump house at the existing Durian Tunggal Dam.
  • Raw water pump station at Durian Tunggal Dam site.
  • Twin 1200mm diameter stainless steel siphon pipeworks from the existing Durian Tunggal Dam to vacuum pump house.
  • 2000mm diameter mild steel pipeworks/manifold from vacuum pump house to the proposed raw water pump station.
  • 1200mm diameter mild steel raw water pumping main from the proposed raw water pump station to Bertam DAF Phase 2 Water Treatment Plant, approximately 5.0km long.
  • Supply, installation, testing and commissioning of vacuum pumpset, raw water pump sets (4 nos. @ 2,625m3/hr), all associated M&E, instrumentation and control systems.
  • All associated ancillary works.