This Project is implemented with the objective to supply treated water to RAPID workers camp as well as consumers at Tanjung Pengelih area. Treated water from Syarikat Air Johor (SAJ) source will be tapped from existing SAJ pipeline at KR road junction at Federal Road FT92 and conveyed through about 14.78km long of mild steel pipeline with nominal diameter DN 650/500mm.
The main components of the Project are as follows :-