As of year 2020, we have completed numerous projects with accumulated contract sum of over RM 2.30 billion with more than 50% or RM 1.33 billion worth of projects were implemented in the past 6 years.
Our biggest achievement is reached in 2014 – 2016 where we constructed and commissioned a RM 720 million water supply project for Petronas’s RAPID development in Pengerang, Johor. This Project : Raw Water Supply Project to Rapid (“PAMER”) consists of 520 MLd River Intake, 72 MCM Earth Dam, 130 ML Reservoir, 260 MLd Pumping Systems, 70km of twin 1.3 meter diameter pipelines and 20km of 1.8 meter diameter pipelines. This Project won the Best Project Award : Infrastructure Project – Major Category in the Malaysian Construction Industry Excellence Awards 2018.
At the height of Johor water crisis in 2015, in addition to carrying out PAMER project diligently, we have assisted the Johor State Government by carrying out several emergency raw water transfer works through fast track turnkey solution to augment the almost empty dams i.e. (1) Lebam dam, Kota Tinggi, (2) Upper Layang dam, Pasir Gudang and (3) Congok dam, Mersing.